New Parish Center/School Construction, Jan-July, 2009
July 12, 2009 . . . . . . . . The following photos were taken on two special days. The first day, Friday, July 10th, was move in-day into the new school/parish center for teachers into their new classrooms and the school office and other rooms readied for use.
The next day, Saturday, July 11th, was landscaping/sidewalk day. A great group of volunteers were on hand each day for the task at hand.
July 10, 2009 . . . . . .MOVING DAY !
Corley Becker, 2nd grade student with a big smile, helps with getting the moving process started.
Diane Becker, Sue Haug, Sheryl Heinen and Lyle Stallbaumer help load up lots of boxes.
Dorothy Hammes is shown here helping in the move.
Pam Lang, John Mulryan and David Gress help with a load from the Music room.
Layne Crabtree and Kortney Holthaus help with the move.
Mary Crabtree, Sue Haug, and Jana Kramer help move things out of Sr. Delores 1st grade room.
Dorothy Hammes and Alex Wilhelm help teacher, Sr. Delores, move things out of her 1st grade room.
Kortney Holthaus helps teacher, Mrs. Christina Lierz, move things out of her kindergarten classroom into the new one.
Rox Holthaus with a load of things taken from the 3rd and 4th grade classrooms, which used to be in the church basement this past year.
A group of volunteer movers wait for their turn to remove things from the trailer.
Dan Haverkamp loads items to be moved in his pickup.
Ross Niehues and Kevin Kohake help move furniture out of the current office.
Dan Haverkamp, Todd Leonard, Kevin Kohake, and John Kohake share a laugh while loading a truck load of things to move into the new school.
Dan Haverkamp, Kevin Kohake, John Kohake and Dan Ronnebaum are seen helping to move the large items to go into the new school.
Ray Rottinghaus and Mike Steinlage help carry items into the new school.
Alan Lierz and Todd Leonard move a refrigerator into the new building.
Volunteers are shown here helping unpack items in the 5th grade room.
Here is a view of the hallway looking west toward the gym.
This is the new school office.
This is a view of the new workroom for the teachers.
This is the new 1st grade room.
This is the new 2nd grade room.
Here is a view of the new computer lab.
Another view of the new computer lab.
The boys locker room restrooms.
Here is a photo of the girls’ locker room restrooms.
The lockers are in the new locker rooms.
This is where the lockers had been before removal from the junior high building.
Doug Enneking is shown here with the trophy cabinets he made for the new school.
Another photo of Doug installing the trophy cases.
Saturday, July 11, 2009 . . . . . Landscaping/Sidewalk Photos
Workers pour concrete for the new sidewalk in front of the building.
Another view of the cement work being done on the sidewalk.
Shane Holthaus, Greg Elder, and Gale Hunninghake look over the work done on the sidewalk.
Sister Delores and Myra Runnebaum work hard on putting in landscape.
More work being done on the landscaping.
Mike Plum, Alan Lierz, Jim Lohmann, and Galen Niehues work hard on getting the landscaping started.
Several of the men are working to prepare the ground to begin work on the base for the new flagpole.
Greg Elder, John Kohake, Gale Hunninghake and Shane Holthaus work on making the base for the flag pole.
Alex Wilhelm is seen here working on the landscaping.
Here is a view of the landscaping work on the west side of the front entry.
Joe and Chase Kramer work on planting the new bushes.
Fifth grader, Chase Kramer is doing his part with the landscaping.
Jim Lohmann and Galen Niehues are working on the landscaping.
Alan Lierz is caught on camera planting lilies outside the new school.
Shane Holthaus . . . . . tired, but cheerful - and still going strong !
Joe Kramer and Aaron Plum are working on the west side landscaping.
Many hands are working hard with the landscaping to make the west side of the building look great.
Landscaping on the west side is finished.
West of the front entrance the landscaping near the building has been put in place.
- – - – - – - – - – - – - – -
Thursday, July 9, 2009 . . . . . Things are really coming along now. Tomorrow is MOVING DAY, Friday, July 10th. Teachers will be moving their equipment, etc. into their classrooms. New photo updates are as follows:
The statue of St. Joseph will be placed here in this area.
The newly refinished statue of the Blessed Mother will be placed here.
Phones have been installed in the classrooms.
Hooks have been put in place at the bottom of the student cubbies.
Here is a view of the ladies restroom next to the Parish Hall.
This is the men’s restroom close to the Parish Hall.
Work has been started on the gymnasium floor.
Another photo of the work being done on the gym floor.
Score clocks have been put up.
Basketball goals have been installed.
Here is a photo of what is being done in the kitchen area.
Here is another photo of the kitchen area.
Photo taken in the kitchen area.
From inside the kitchen, this is the view looking out to the parish hall.
Parish storage room on the west side of the building.
Thursday, July 9, 2009. . . . . . . .
Here is a view of the Parish Hall (looking southeast).
The fence that surrounded the building project was removed today.
Goodbye fence !!!!!!!!!!!!!!
Here is another photo of the school with the fence partially down . . . . still waiting for the posts to come down here.
This is a view of the new School/Parish Center as it looks today. Move in day is tomorrow Friday, July 10.
- – - – - – - – - – - – - – - – -
June 30, 2009 . . . . . . . . . The following are photos taken today of some of the inside areas of the new Parish Center/School under construction.
This is a photo of the spot where the statue of the Blessed Mother will be placed. They are very close to finishing the work here.
Stalls are being put in place in the locker room restrooms.
Another photo of the bathroom stalls.
The gym is being cleared out so workers can begin putting in basketball goals and the volleyball net.
The Parish Hall has been cleared out and the workers are busy doing the finish work on the floor of the hall.
Here is another view of the Parish Hall.
This photo shows the work being done on the hallway floors in the main entry. This view is taken from the Parish Hall looking towards the school area.
This cabinet in the hallway will hold the fifth grade instruments while they are not in use.
Workers are beginning to put up tack boards and dry erase boards in the classrooms.
These tack boards and bulletin boards are ready to be put up.
Here are more tack boards that will be hung in the hallway of the school.
More photos of the tack boards and dry erase boards.
This is a current photo of the new Fourth Grade Classroom.
- – - – - – - – - – - – - -
June 22, 2009 . . . . . . . . . . . .A few photos were taken today of the new Parish building under construction.
On the outside of the new Parish Center/School it is noted that the guttering has been placed on the bell tower.
The following photos are of the inside of the new Parish Center/School.
The ceiling tiles are being put up in the hallway of the school.
All the doors have been put in place throughout the building.
Here is a view of the hallway looking west toward the gym.
This photo shows the Promethean boards have been installed in the classrooms. These boards are interactive whiteboards.
The preschool classroom has the toilet and sink in place.
In this photo is a view of the entryway to the main office of the school.
Toilets have been installed in the parish hall women’s restrooms.
This photo was taken in the men’s restroom which is connected to the parish hall.
The dishwashing area of the kitchen is shown here.
Appliances and sinks have been moved into the kitchen.
More Kitchen equipment pictured here.
Shelving in the kitchen storage area.
A current view of the Adoration Chapel.
Mirrors have now been put up in the girls’ restrooms connected to the locker rooms.
Tile is being put down on the floors.
- – - – - – - – - – - – - – - – - – - – - -
June 6, 2009 . . . . . . . . The following are new photos of the inside of the new Parish Center/School.
This photo shows one of the hallways in the new school area. The tile has been put down.
The hardware is being installed on the cabinets in the classrooms.
The sinks are now in the classrooms.
This photo shows some of the cabinets in the teacher workroom.
The sinks are being installed in the restrooms. This photo shows the girls’ locker room sinks.
The drinking fountains WORK !
This photo shows some of the cabinets in the kitchen area.
The walk-in freezer and cooler have been put in place in the kitchen.
This is a photo of the sink area near the kitchen.
Work in the kitchen area is progressing well.
This photo is of the guttering for the bell tower and is being kept in the school until it’s ready to be put on.
This is the parish hall area and is currently in the process of being painted.
Here is a photo of the preschool classroom. Dick Miller is working on painting the door trim.
This photo was taken in the hallway of the school. You can see where the statue of the Blessed Virgin Mary will sit as well as the doorways of a couple classrooms.
- – - – - – - – - – - – - – - – -
May 22, 2009 . . . . . . . More work has been done in the new Parish Center/School. Here are some photos of some of the work recently done .
Sinks are being installed in the building. This is a photo of the locker room area.
The locker rooms are being painted ….. this is a photo of an office in a locker room.
This photo shows the door trim being painted.
Cabinets are being installed in the classrooms … this photo shows work being done in the 4th grade room.
Cabinet with sink and the cubbies are installed in some of the classrooms.
- – - – - – - – - – - – - – - – - – - -
MAY 18, 2009 . . . . . . . Today the students of SPPS were all able to take a guided tour of the new Parish Center/School building currently under construction. This fall when they return to school some of them will be going to school in this new building.
In this photo the students are looking at the new parish center/cafeteria.
These next four photos show the students listening to Mr. Todd Leonard tell about the gym and the locker rooms.
This photo shows the future 2nd grade class in their new classroom.
Here is a photo of the children viewing the cubbies in the Kindergarten classroom.
This photo shows the ‘09-’10 1st grade class in their new classroom with their next school year’s teacher, Sr Delores Dolezal.
This photo shows the children at the entrance to the main office.
– – - – - – - – - – - – - – -
May 11, 2009 . . . . . . . .The cabinets arrived last week for the new building under construction. Koch and Company, Seneca, made the cabinets and delivered them to the site. Workers have been installing them in the classrooms. Shown unloading the cabinets are Greg Elder and Rick Henry, members of our Parish.
- – - – - – - – - – - – - – - – - -
May 3, 2009, Sunday . . . . . . . . An open house was held this evening at the new Parish Center and School. Every one was invited to the status update and a tour of the new facility. A large crowd was in attendance to sneak a peek at the new building. AHRS company representatives were on hand to give a report on the progress of the building. Here are a few pictures of the Open House.
- – - – - – - – - – - – - – -
April 24, 2009 . . . . . . . . . The following are updated photos of some of the areas inside the New Parish Center/School Building under construction.
Here is the latest photo of the gym. The bottom half of the gym walls have been painted BLUE ! It’s beginning to look like a real gym now.
Here is another photo of the gym.
This is an updated photo of the Parish Hall looking to the southeast.
Here is a photo of the Parish Hall looking east . . . ceiling work in being done.
This photo shows work being done in the kitchen area.
Here is a view of the kitchen. This photo was taken from the parish hall area.
This photo is of the coaches office in boy’s locker room.
- – - – - – - – - – - – -
April 22, 2009 . . . . . . . . . . . . . - The Bell Tower Is On -
This was an exciting day for Saints Peter and Paul Parish and School. The entire SPPS student body was able to watch as the roof of the bell tower ( preserved from the old school building ) was lifted onto the new building.
The following photos marked the wonderful event. (For an enlarged view click on the picture.)
- – - – - – - – - – - – - – - – - – -
April 15, 2009 . . . . . . . . Here are the latest photos of the new Parish/School Building Construction that is taking place.
Here is a photo of the outside of the building to date.
The following five pictures are of the bell tower which is in the process of being painted now before it is to be placed on the new building. There are several photos of a close-up of detail on the bell tower roof.
Sheetrock work is currently being done in the kitchen .
The hoods are being installed in the kitchen.
The gymnasium is in the process of being painted.
- – - – - — – - – - – - – - – - -
April 3, 2009 . . . . . . . . . . . . . The following are some more photos of the inside of the new building as of last week. Since then, the workers have been putting up sheetrock in the new kitchen area.
Here Sister Delores is caught by the camera heading towards the First Grade classroom to check it out.
Sister Delores stops and poses for a photo inside her (soon to be) new First Grade classroom.
This photo was taken looking into the office of the school.
This following photo was taken within the school office.
This photo was taken looking west down the hallway towards the gym entrance.
Duct work is being added to the gym.
More photos of the duct work.
- – - – - – - – - – - – - – - – - – -
March 26, 2009 . . . . . . . . The following four photos show the workers forming the brick work that will hold the Bell Tower.
This photo shows the entrance to the Adoration Chapel on the west side of the building.
- – - – - – - – - – - – - – - – -
March 25, 2009 . . . . . . . . . . . . . . These following four photos show the work and progress the workers are completing this afternoon on the bell tower.
Here in this photo is a view of the front of the building as of March 25, 2009.
Here the second arch is being put into place.
One of the arches is in place in this photo.
In this photo the last of the arches is waiting to be lifted from the truck.
In this photo the workers get ready to lift the arches of the new bell tower from the truck.
The next two photos show work on the entryway and the cornerstone above the entryway.
In this photo the cornerstone that was saved of the 1895 school building is put into place above the entryway to the new building.
Here is another photo of the Adoration Chapel entrance on the west side of the building.
This photo shows the workers working on the pillars that lead up to where the bell tower will be placed.
- – - – - – - – - – - – - – - – - – -
March 19, 2009 . . . . . . . . . Photos taken today show many areas of construction update of the inside of the new building.
This photo shows the office entryway:
This photo shows the doorway and window for the conference area:
The following two photos are up to date pictures of the parish hall :
This is an updated photo of the gym:
This area here is being built for the large statue of Mary to sit in:
This photo was taken from inside one of the classrooms looking towards the door:
This photo shows work being done in the hallway of the school:
This photo shows the media center:
- – - – - – - – - – - – - – - – - – - -
March 18, 2009 . . . . . . . . . . Here are a few more photos of the work recently done on the outside of the new Parish Center/ School.
The brickwork on the front is almost complete and work has been done on the front entryway.
The columns that will hold the bell tower roof have been formed.
- – - – - – - – - – - – - – - – - -
March 11, 2009 . . . . . . . Here is the most recent photo of what the outside of the new school/parish
center looks like.
- – - – - – - – - – - – - – - – - – - – - – -
March 03, 2009 - The following photos show some of the work and progress being done recently on the new construction of Parish Center/School at Saints Peter and Paul Parish.
This picture shows brickwork being done on the southeast end of the school.
More brickwork being done.
Workers are beginning to put up sheetrock in areas of the building.
This photo shows the adoration chapel entrance. Workers were adding glass to the sidelights and above the door.
Another photo of the glass being added to the Adoration Chapel entryway.
Workers have hung lights in the gym.
More brickwork being done on the front of the school area.
- – - – - – - – - – - – - – - – - – - – - -
February 22, 2009 . . . . . . . Progress is being made with the new Parish Center/School Construction site. The following are many photos of both the inside and outside of the building to date..
This photo shows the new windows put in last Friday (2/20) on the east side of the school:
This photo shows the north side of the school. The windows are being framed in. This window will be in the new library:
Some of the windows are being framed in and put in. Here shows a close-up of one of the windows:
This photo shows the 5th grade doorway (all the way to the left) and the 4th/3rd grade doorways straight ahead:
In this photo shows the computer lab. To the right is the library:
Here in this photo we are looking east from one of the gym exits. If you walk east down this hallway, you will find restrooms/locker rooms on either side of the hall. Continuing on you will come upon the classrooms:
Here in this photo we are inside the gym looking south:
In this photo we are inside the gym looking southwest:
This photo looks north down the hallway from the front entrance. The door ahead is the main entrance to the school office:
This photo shows the 2nd/1st grade doorways. These two rooms are not completely framed in as of yet:
This photo shows a good and close picture of the hallway leading west to the gym.
Inside the building this photo shows the beginning of the hallway leading west to the gym. This hallway is located between the faculty workroom and the computer lab:
This photo shows more of the inside of the building. The 4th/3rd grade doorways to the left. On down to the left is the 2nd/1st grade doorways. Straight ahead down the hallway is the Preschool classroom. To the right is the faculty workroom:
This photo shows the faculty workroom:
This photo shows the 4th and 3rd grade doorways:
This photo shows the fifth grade doorway:
This photo shows the brick work that’s been done on the north and east sides of the gym and school.
February 22, 2009 . . . . . The brick for the building arrived last week and the brick work on the building has begun.
February 17, 2009 . . . . . . Construction progress.
Feb 5, 09 -The following photos were taken of the outside and inside of the new Parish Center/School under construction showing the progress being made this month to date.
East side of the building.
Feb 5, 09 - Back of building (openings show back doors of the building and large window in media center).
Feb 5, 09 - Almost finished putting tin on backside of building….also working on gym roof.
Feb 5, 09 - Door frames for comptuer lab and media center (looking northwest).
Feb 5, 09 - More door frames in office area (looking northeast).
Feb 5, 09 - Hallway between school and parish hall….the door frame you see is the entrance to the school office.
Feb 5, 09 - Parish hall ….looking toward the east (can see walls for parish hall restrooms)
Feb 5, 09 - Electrical work around kitchen and storage areas.
Feb 5, 09 - Looking at kitchen area from parish hall.
Feb 5, 09 - working on gymnasium roof.
Feb 5, 09 - Gymnasium …. working on the roof.
Feb 5, 09 – Parish Hall.
02-05-09 - Office entry and Principal’s office door frame.
Feb. 5, 09 – Door frames of 2nd and 1st grades.
Feb. 4, 09 – Office/conference area door frames.
02-04-09 – Door frames of computer lab and media center (library)
Feb 4, 09 - Door frames of 5th, 4th, and 3rd grades.
January 23, 2009 – - – - – - – - The construction crew are busy getting some of the insulation work done. Today they are seen working on insulating the roof of our new Parish Center/School building. There has been no snow lately to interfere in their progress just cold January weather.
January 15, 2009 – - – - -These following photos were taken within the last few days. Photos are of the inside of the building and, also, the outside of the building. Some of the inside wall studs and doorways are up.
January 13, 2009 – - – - – - – - – construction continues.
January 10, 2009 – - – - – - – - – - construction photo of south and west sides of the building.
January 6, 2009 – - – - Much construction progress is being done. The weather is cooperating. They are really coming along with the front of the building. It’s looking “ AWESOME”!
January 5, 2009 – - – - – Concrete is being poured for the ceiling of the locker rooms.
January 5, 2009 – - – - – - -
January 1, 2009 – - – - – - - – Construction continues in the new year.